Peugeot 205 Manual
Engine removal and overhaul procedures Engine removal and overhaul procedures
Included in this Part of Chapter 2 are details of removing the engine/transmission from the car and general overhaul procedures for the cylinder head, cylinder block/crankcase and all other engine internal components. The information given ranges from advice concerning preparation for an overhaul and the purchase of replacement parts, to detailed step-by-step procedures covering removal, inspection, renovation and refitting of engine internal components.
- Specifications
- General information
- Engine/transmission removal - preparation and precautions
- Engine/manual transmission - removal, separation, reconnection and refitting
- Engine/automatic transmission - removal, separation, reconnection and refitting
- Engine overhaul - preliminary information
- Cylinder head - dismantling, cleaning, inspection and reassembly
- Piston/connecting rod assembly - removal and inspection
- Crankshaft - removal and inspection
- Cylinder block/crankcase - cleaning and inspection
- Main and big-end bearings - inspection
- Engine overhaul - reassembly sequence
- Piston rings - refitting
- Crankshaft - refitting and main bearing running clearance check
- Piston/connecting rod assembly - refitting and bigend bearing clearance check
- Engine - initial start-up after overhaul
© 2024 www.peugeot205.ru. All Rights Reserved.